The Brief
Gashco needed a comprehensive office transformation at their Gatwick site, including the creation of modern office space, a kitchenette, WC facilities, and a separate storage area. The project required a full-scale fit-out to meet their operational needs, ensuring the space was functional, energy-efficient, and compliant with all building regulations.
Presence & Co. was responsible for delivering a high-specification interior, including mechanical, electrical, and HVAC installations, as well as fire safety and access control solutions.
Our Approach
Workspace Design & Construction
- Installed new stud partition walls, fully insulated and finished with high-quality white emulsion paint.
- Constructed a dedicated storage area with a sealed concrete floor.
- Installed fire-rated doors and joinery, ensuring compliance with fire safety standards.
- Upgraded skirting, architraves, and interior trims with a modern satin white finish.
Plumbing & Kitchenette Fit-Out
- Installed a fully functional kitchenette, including:
- 600mm integrated dishwasher.
- Under-sink 10L hot water heater (2kW) for instant hot water.
- Stainless steel sink unit with waste connections integrated into the existing foul pop-up.
- Connected new WC facilities, ensuring compliance with Building Regulations.
- Installed a fresh air ventilation system to improve indoor air quality.
Electrical & Lighting Installations
- Power Supply & Distribution:
- Installed dado and surface-mounted trunking throughout the office for efficient power distribution.
- Integrated double socket outlets, with power supplied from an upgraded distribution board.
- Installed networked access control systems at entry points, enhancing security.
- Lighting & Emergency Systems:
- Upgraded to 600×600 LED modular office lighting with emergency backup units.
- Motion-activated lighting in WCs, meeting rooms, and storerooms.
- Fire alarm upgrades, including new detectors and call points installed in each subdivided area.
Heating, Cooling & Ventilation
- HVAC System Installation:
- Designed and installed a Split DX heating & cooling system, maintaining a stable 18-24°C temperature range.
- Positioned external condensers on North and East-facing walls to maximise efficiency.
- Routed all pipework within ceiling voids, maintaining a seamless finish.
- Installed humidity-controlled extraction fans in the tea point area and WCs to ensure proper ventilation.
The Result
The new Gatwick office was completed on time and within budget, delivering a modern, functional, and energy-efficient workspace for Gashco. The integration of advanced security, electrical, and HVAC systems ensured a comfortable and compliant working environment.